Much was accomplished today- The drains are all in place - The stool is installed and the shower fixtures and drain is all connected. The washer plumbing bits are all done. Tomorrow we put water to it all and see if everything stays together without leaks. If all goes as planned the bathroom will be 90% complete needing only a vanity installed, some door trim and a few other odds and ends. We are getting more and more excited!
Friday, April 26
The Brothers Three of Four
Leo, Butch and Bill Brooker at Wet Goods where we enjoyed supper after a long hard day of work.
Bill in the crawl space putting pipe together and below is a work site shot
Much was accomplished today- The drains are all in place - The stool is installed and the shower fixtures and drain is all connected. The washer plumbing bits are all done. Tomorrow we put water to it all and see if everything stays together without leaks. If all goes as planned the bathroom will be 90% complete needing only a vanity installed, some door trim and a few other odds and ends. We are getting more and more excited!
Much was accomplished today- The drains are all in place - The stool is installed and the shower fixtures and drain is all connected. The washer plumbing bits are all done. Tomorrow we put water to it all and see if everything stays together without leaks. If all goes as planned the bathroom will be 90% complete needing only a vanity installed, some door trim and a few other odds and ends. We are getting more and more excited!
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment