Insulation: We were not happy with the job they did; there were holes in places, too thin in others, and overall not anywhere near the excellent job we had on our house in 2013. So I called them to tell the owner that it was not well done. He sent a crew out right away and they resprayed in several places and rectified most of the issues. So we move on.
I also called the Garage door people and found out we are scheduled for October 15th in the afternoon. So things are getting done.
The ceiling is finished and Butch has installed two ceiling fans and 11 LED lights.
Tomorrow we will be doing the floor with Epoxy. We have to wait 16 to 24 hours before much more can be done so that will give us a bit of a break.
The motorhome is still not done but we do plan to wrap things up when it is ready and head South. A tentative promise by the repair people is November 1st. By the time we leave, we will have most things ready to receive the pool table next Spring. A good place to leave things and we will be excited at the prospect of getting the final touches done.
So now I am heading out to finish the prep work on the floor...
No comments:
Post a Comment