Tuesday, August 18

Progress on Project 8/18/2020

 I haven't posted anything on the progress for a while or at least it seems that way. Butch is starting on electrical. Russ has the soffit done on one side and he most likely will finish it and the other side today. Then siding, doors, and windows will follow. Butch and I plan to do the interior walls after it is insulated so it is coming right along.

Our motorhome being in the RV hospital is concerning us. It must be finished before we can go to Texas this fall. Also, we did not realize how much we used it for storage. Maybe storage is not the right word. We did not take many items out until we needed them, such as I had an abundant supply of eyeglass cleaner packets. Guess what! I ran out in the house and they are in the motorhome. This has happened on different items 3 times now. Not earth-shattering in the scheme of things.

Butch must be doing better with the healing of his leg. He is leaving his canes in the house once again. And last night when he came in from working in the pool hall he was not limping as much. The PT people in Texas told him it would be 6 months at least and maybe longer.  September 7th will be the 6-month mark of the great fall.

Here are pictures I took this morning:



Here are the limbs waiting for pickup. This is the bigger stuff. The smaller stuff, 3 or more pickup loads have already been taken to the city compost pile. This curb appearance is duplicated all over town.


No comments: