Thursday, September 6

Drywall-in process

Butch is standing in the bedroom watching them work in the main room.

Photo taken from breezeway door. Of the two doorways  the left is bedroom and the right is bath

Door on the left is out to the back yard

This is the bedroom- taken from bedroom doorway in the main room




Taken from the front door looking into main room

Looking at front door and future kitchen area

Doors from left: Bedroom,bathroom and front door.

Looking at the breezeway door while standing near the front door.

Standing in the closet looking through the bedroom to the main room.
Standing in the closet looking through the bathroom to the main room

Standing in east end of closet looking toward west end. Door in pic is the bedroom

Standing in west end of closet looking east. Door in pic is bathroom

Butch decided he needed to check shower plumbing for leaks before they drywall. No more to say from here about that. So yesterday he put most of it together in the garage and then when the drywall guys left for the day we plumbed it so we could check for leaks. I said a little prayer for a leak free outcome and my prayers were answered. I was more than a little grateful and I know Butch was as well. Since he had so much of it done ahead it really did not take all that long. Leo and Keri stopped by just as we finished.
They should finish the hanging of drywall and start on the taping and mudding today.
It is coming along and looking very different. This is the day we would have been heading for the Clay County Fair but the gang will have all the fun without us this year. I do have 5 pictures entered so if you are up in the area during the fair have a look see for me.